Naval Medical Center

Project Description

Assess HVAC heat loads in Buildings 1, 2 and 3 HAVAC systems (heating & Cooling loads including piping systems to the central plant boundary interface. Calculate all required air flow rates, chilled water flow rates, and heating hot water flow rates for HVAC equipment including pipe sizes, duct sizes, air handler capacity, VAV terminal box size, reheat coils size and diffusers and Air handling systems equipment, identifying the current HVAC, air handlers, fans VAV and supply/return equipment. As well as chilled water, heating hot water, cooling towers and condensing water equipment and system capacity to determine compatibility. Test & Balance data, HVAC Load Analysis, Dynamic piping analysis, field observations, as-Built construction document, repair and trouble call history. The Study is to be used for future solicitation to renovate HVAC systems