Fire Station No. 9

Project Description

This project was to evaluate the existing condition of the roof top equipment and replace them with the cost and energy efficient units. Teza design performed load calculations and several field investigations to provide the optimum mechanical design. The scope of work also included providing new ductwork design and replacement of the exhaust fans. All design work was conducted according to 2007 California Mechanical and Plumbing Codes.